NOVEMBER 2025
Re-Evaluation Results
Based on public feedback, ITD reanalyzed the original four design alternatives using updated traffic data. Data confirmed that the US-95 and Appleway Avenue intersection must be grade-separated to meet the project goals.



1/2
Click the arrows to see the difference between the existing conditions and the proposed design. You can also click the images to view them larger.
Unchanged Design Improvements
-
I-90 widening from Northwest Boulevard to 4th Street
-
Single-point urban interchange (SPUI) at I-90 and US-95
-
Elevating US-95 over Appleway Avenue so the two roads are grade-separated and no longer intersect
-
Roadway widening and intersection improvements on US-95, 4th Street, and Northwest Boulevard
-
Bicycle and pedestrian improvements throughout the project area