Re-Evaluation Results

Based on public feedback, ITD reanalyzed the original four design alternatives using updated traffic data. Data confirmed that the US-95 and Appleway Avenue intersection must be grade-separated to meet the project goals.

Click the arrows to see the difference between the existing conditions and the proposed design. You can also click the images to view them larger.

Unchanged Design Improvements
  • I-90 widening from Northwest Boulevard to 4th Street

  • Single-point urban interchange (SPUI) at I-90 and US-95

  • Elevating US-95 over Appleway Avenue so the two roads are grade-separated and no longer intersect

  • Roadway widening and intersection improvements on US-95, 4th Street, and Northwest Boulevard

  • Bicycle and pedestrian improvements throughout the project area

Additional Resources

Use the button below to download a printable overview flyer.

Elements of design are shown on the following pages. Use the button below to download a design document that provides supplemental details to be viewed in conjunction with the content of this site.